Big O Tires

PROJECT DESCRIPTION

This was a design build project coordinated between ARC construction, Tom Sondergeld Plumbing, and the Big O franchise owner.

The building was designed from the ground up and included eyewash stations, water fountains, 2 ADA compliant restrooms, and 1 ADA compliant employee restroom. Tom Sondergeld Plumbing designed and installed all of the piping for the air system, installed over 100’ of trench drain in the service area, and installed all of the gas piping for the HVAC systems and appliances.

Through good coordination and team work this project went from an empty field to an operating Big O with a show room and service area in less than 90 days.